Arc Magnets India: Sizing Tool & Sourcing Guide

Size concentric arcs, screen grades and model Indian tax. Edit an example, then export a preliminary RFQ.

Arc magnet sizing

Export RFQ
Arc sizing and preliminary RFQ

Illustrative dimensions; no customer design or approval implied.

20–1000

2–96, even integer

0.5–40

2–500

Concentric arc cross-section, schematic

Outer chord 11.01 mm · 5.87° arc

Ro 107.5 / Ri 104 mm · 8.59 g per segment

Updates instantly. Concentric arcs only; Ø is the magnet envelope, not the rotor assembly.

Adjust arc coverage, temperature, exposure & tax assumptions

All fields are required. Defaults are examples. Magnet temperature = ambient + estimated magnet rise; use measured or simulated magnet temperature where possible.

0.3–0.95

10–65

0–180

Add exact quantity to RFQ. No price or delivery promise is inferred.

1–1000000000

0–100

0–100

Example inputs: embrace 0.75; ambient 45°C + magnet rise 95°C; monsoon exposure. Geometry excludes chamfers, coating build and adhesive clearance; mass assumes NdFeB at 7.55 g/cm³ and one segment per pole.

Thermal shortlist

N35UH

Magnet estimate 140°C; screening at 160°C.

Temperature shortlist only, using an assumed 20°C margin. Validate the supplier B-H curves at magnet temperature, rotor load line and peak opposing field. This does not assess demagnetization safety or vehicle approval.

Next: validate B-H curves

Coating candidate

Ni-Cu-Ni + Epoxy candidate

Proposed salt-fog discussion target: 240 h.

Illustrative RFQ test target only. ASTM B117 does not specify product acceptance hours or predict service life. Agree corrosion, adhesion, edge coverage and assembled-motor tests with the supplier.

Next: agree test acceptance

Import tax scenario

₹1,27,735.00 cash

Base amount
₹1,00,000.00
BCD / SWS
₹7,500.00 / ₹750.00
GST (18%)
₹19,485.00
If full ITC eligible
₹1,08,250.00

User-entered scenario, not a quote or verified current tariff. SWS assumes 10% of BCD. ITC eligibility and recovery timing need confirmation. Excludes tooling, broker fees, local freight and additional levies.

Next: confirm tariff with broker

Export your preliminary RFQ

Include your signed drawing, polarity, quantities and required date. This brief requests review; it does not qualify a motor or material.

Email engineering desk
Email opens your mail app. Attach the downloaded TXT and drawing manually.
View / select RFQ brief

1. Decisions to make before buying arc magnets in India

Use this page for preliminary concentric-arc sizing and RFQ preparation. It complements the logistics comparison in our India sourcing guide. The tool does not simulate a complete motor, qualify a coating, issue a tax ruling or award a vehicle approval.

Five decisions, evidence and next steps
DecisionWhat is supportedAction / limitation
Size from the magnet drawingAnnular-sector geometry, reproduced in section 3Confirm assembly clearance; IPM pockets and tapered arcs need CAD.
Validate heat at the magnetSupplier grade data; see thermal source belowShortlist only: obtain hot B-H curves and peak-current load lines.
Specify a corrosion test planASTM B117 public scope; see coating source belowHours are agreed targets; validate seals and adhesive compatibility.
Separate cash tax from creditExplicit arithmetic in section 8Confirm current rates, classification and ITC eligibility with broker.
Verify the producing plantMHI scheme targets; see capacity sources belowPolicy targets do not prove current qualified supply.

Evidence: Arnold: NdFeB grade data and application caveats; ASTM B117-26: scope and limitations; PIB: REPM manufacturing scheme approval. All sources and unresolved verification items are dated in the registry below.

2. Thermal grade screening: a shortlist, then motor validation

Estimate magnet temperature from the intended duty cycle, cooling and hot spots. Winding, housing and magnet temperatures can differ. A regional ambient assumption is not a measured rotor temperature. In the tool, the default is 45°C ambient + 95°C magnet rise = 140°C, followed by an assumed 20°C screening margin.

Diagram 2: Qualitative B-H CurvesSchematic — not measured data
Relative flux density B← Opposing field H (not to scale)Lower-temperature exampleHigher-temperature exampleHigher-coercivity exampleValidate actual hot B-H curvesIllustrative operating zoneMotor load line not plottedNo safety result inferred

Illustrative schematic; use the adjacent method, source and limitations. No measured performance or approval is implied.

Illustrative supplier temperature classes used in the shortlist
Example candidateCatalog temperature classHow the tool uses it
N4580°CCandidate if estimated magnet temperature + 20°C ≤ 80°C
N42M100°CNext candidate above the standard class
N40H120°CNext candidate above the M class
N38SH150°CAt 140°C estimated temperature, the margin moves screening beyond SH
N35UH180°CDefault 160°C screening temperature shortlists UH
N33EH200°CAbove this screening temperature: specialist AH / SmCo review or redesign

Reference: Arnold: NdFeB grade data and application caveats. Grade properties vary with geometry and manufacturer. The 20°C margin is our transparent screening assumption; it is not a standard or a guarantee. These labels do not establish an irreversible flux-loss limit.

What must be checked before release?

Ask for B-H curves at the actual magnet temperature and evaluate the operating point under maximum opposing field, field weakening, stall and fault conditions. Validate the assembled motor and agree the allowable irreversible loss with the buyer. Grain-boundary diffusion may improve coercivity; request grade-specific evidence instead of assuming a universal Dy/Tb saving or coercivity improvement.

Next: add curve data and validation requirements to the RFQ.

3. Reproduce the arc geometry and understand its limits

The model assumes a concentric annular sector, constant radial thickness and one magnet per pole. Enter the magnet envelope diameter from the drawing. For an outer rotor this may be near a rotor bore; for an inner rotor it may be near the rotor surface. Neither is automatically the complete rotor outer diameter.

Diagram 1: Arc Segment GeometryRadial Flux Rotor Segment
Center of Curvature (O)Chord Width (W_ch)θ (Arc Span Angle)Thickness (T_m)Ro (Outer Radius)Ri (Inner Radius)Key Formulas:Wch = 2·Ro·sin(θ/2)θ = (360° / 2p) · α_p

Illustrative schematic; use the adjacent method, source and limitations. No measured performance or approval is implied.

Geometry equations and units
OutputEquationBoundary / assumption
Outer and inner radiusRo = entered diameter / 2; Ri = Ro − thicknessAll dimensions in mm; require 0 < Ri < Ro
Pole pitch and magnet spanPitch = 360° / poles; θ = pitch × embraceEven integer poles; embrace 0.30–0.95
Outer chordW = 2 × Ro × sin(θ / 2)Convert angle to radians for calculation; not the inner chord
VolumeV = θrad / 2 × (Ro² − Ri²) × axial lengthmm³; excludes chamfers, eccentricity and coating
Massm = V × 0.00755; total = m × poles / 1000Assumed NdFeB density: 7.55 g/cm³; total in kg
Diagram 3: Concentric vs Eccentric ArcQualitative profile comparison
Concentric Arc (Uniform T)Example air-gap field shapeUniform thickness exampleTapered Arc (Illustrative)Example field shapingTapered profile: test required

Illustrative schematic; use the adjacent method, source and limitations. No measured performance or approval is implied.

Tapered arcs, skew and magnetization changes can alter the air-gap field. Compare designs with identical slot/pole combinations, current, magnet volume and air gap; quantify ripple and average torque in the same model and test rig. No fixed cogging reduction is claimed here. IPM pockets, Halbach arrays, eccentric arcs and multiple slices per pole require their own CAD and magnetic model.

Method: analytic annular-sector geometry implemented in the calculator. Density is an explicit estimate, not a supplier certificate. Return to dimensions or request a drawing review for other shapes.

4. Monsoon and coastal exposure: qualify the complete protection system

Screen exposure to condensation, salts, immersion and abrasion separately. A coating candidate must also suit the adhesive, edge finish and enclosure. A coated magnet alone cannot establish suitability for a flooded hub or a pressurized submersible pump.

Diagram 4: Monsoon Multi-Layer CoatingCandidate layers; qualify by test
Sintered NdFeB substrate — protect from moisture1. Nickel base — agree the coating process2. Copper interlayer — specify with supplier3. Nickel barrier — agree thickness and adhesion4. Epoxy topcoat — inspect coverage and adhesionPerformance requires testing

Illustrative schematic; use the adjacent method, source and limitations. No measured performance or approval is implied.

RFQ discussion targets, not certified coating ratings
ExposureCandidateIllustrative salt-fog targetEvidence still needed
Controlled inlandNi-Cu-Ni72 hLot report, edge coverage and adhesive compatibility
Condensation / monsoonNi-Cu-Ni + epoxy240 hAgreed corrosion and adhesion criteria; assembled-motor test
Coastal / salineZnNi + epoxy or supplier alternative500 hSalt exposure, seal integrity and actual coated-part test
Immersion / submersibleQualified encapsulation and sealingNot determined by this toolPressure cycling, fluid chemistry and motor-level validation

ASTM B117-26: scope and limitations defines a test practice, not a required number of hours or a service-life conversion. The tool targets above are proposed procurement discussion points. Specify specimen condition, scribing if applicable, failure definition, replicates and report traceability. Any PCT / humidity / adhesion test needs its own agreed protocol; this page does not assign universal acceptance limits.

5. Separate vehicle standards, product tests and sourcing policy

AIS-156 scope

AIS-156 concerns L-category electrical powertrain safety and REESS safety. The cited Amendment 3 adds battery-related safety provisions. It does not substantiate a universal motor back-EMF loss limit of 3%, a mandatory SH/UH magnet grade, or the universal 100-cycle motor test. Motor qualification and vehicle approval require an agreed test plan.

MoRTH: AIS-156 Amendment 3 (September 2022)

BEE 5-Star fan claims

Fan ratings depend on service value (air delivery divided by input power), sweep category, applicable edition and testing. A wattage figure or magnet grade alone cannot establish a star rating. Confirm the current schedule and model registration.

BEE: historical Ceiling fan Schedule 8, Revision 2 (2019)

Domestic REPM capacity

The November 2025 approval provides ₹7,280 crore toward a target 6,000 MTPA of integrated manufacturing. The December 2025 notification and March 2026 tender describe a programme, not a guarantee of current qualified arc supply. Current plant output, grade range and automotive lot qualification remain supplier-specific and unverified here.

PIB: REPM manufacturing scheme approval; MHI: REPM scheme notification, S.O. 5800(E);MHI: March 2026 REPM request for proposal

PM E-DRIVE, BIS and quality orders

This calculator does not establish incentive eligibility or exemption from a BIS quality order. Check the current scheme, vehicle category, part scope and manufacturing records with the buyer and responsible authority. Do not apply an electrical-steel standard to permanent magnets without verifying its scope.

Current product-specific legal applicability: not determined on this page.

6. Compare Indian stockists and direct manufacturers on evidence

Diagram 6: Sourcing Decision FlowchartVolume & Custom Tooling Path
ProcurementVolume & TimingCheck stocked dimensionsDomestic Indian StockistImmediate INR BillingConfirm stock drawingConfirm production + transitDirect Factory OEM AirCustom Tooling & PPAPRequest lot grade evidenceConfirm freight + clearanceDirect Factory Ocean FCL/LCLCompare all landed chargesFull Indian Port Clearance

Illustrative schematic; use the adjacent method, source and limitations. No measured performance or approval is implied.

Supplier comparison questions; no assumed market prices or delivery guarantees
DimensionDomestic stockistDirect factory
AvailabilityConfirm physical stock and dispatch dateSeparate tooling, production, inspection and transit dates
Grade traceabilityRequest producing mill and lot certificateVerify heat / lot chain and supplied grade data
CustomizationConfirm actual stock drawing and coatingApprove tooling drawing, tolerance and first article
Quality documentsRequest the actual available reportsAgree buyer-required PPAP scope; Level 3 is not automatic
Comparable costObtain domestic taxable price and delivery costsObtain Incoterm, assessable value and all excluded charges
FallbackUse for fit trials only if production evidence is incompleteQualify an alternate plant and reserve drawing-controlled samples

Prototype speed has value only when the supplied dimensions and grade are known. For series sourcing, compare two quotations with the same material, drawing revision, coating, quantity and acceptance plan. No universal direct-factory saving or stockist quality deficit is established here.

Export-linked routes: DGFT: FTP 2023 Chapter 4, clauses 4.14–4.16 describes conditional Advance Authorisation exemptions and actual-user requirements. Obtain an authorisation-specific review before assuming relief. Bonded manufacturing also needs a scheme-specific customs review; neither relief is applied by this calculator.

7. Choose gateways around the receiving plant

Diagram 5: Indian Manufacturing CorridorsPort & ICD Hub Logistics
Delhi NCR / Manesar / NoidaEV 2W/3W Hubs & BLDC FansGateway: IGI Air Cargo (DEL) / ICD TughlakabadGujarat / Sanand / Vadodara4W EV Powertrain & Large MotorsGateway: Mundra Port / Ahmedabad AirPune / Chakan / TalegaonIndia Premier EV & Auto Tier-1 ClusterGateway: Nhava Sheva (JNPT) / BOM AirBengaluru / Hosur ClusterE-Scooters (Ather/Ola), Drones & RoboticsGateway: Kempegowda Air (BLR) / ICD WhitefieldChennai / Sriperumbudur / OragadamHeavy Commercial EVs & Auto OEMsGateway: Chennai Sea Port / MAA AirCoimbatore Pump & Motor HubSubmersible PM-KUSUM Pumps & ServosGateway: Kochi Port / Coimbatore Airport

Illustrative schematic; use the adjacent method, source and limitations. No measured performance or approval is implied.

The schematic pairs example receiving regions with gateways to discuss with a forwarder: Delhi-NCR with DEL; Pune with Mumbai / JNPT; Bengaluru-Hosur with BLR or a southern seaport; Chennai with Chennai sea / air; Gujarat with Mundra; Coimbatore with a suitable southern gateway. It is not a service map, geographic scale map or clearance-time promise.

Compare door-to-door quotations, customs capability, onward transport, packaging and demurrage exposure. For magnetized air cargo, ask the carrier to determine classification and acceptance under the current dangerous-goods rules, including PI 953 / UN 2807 where applicable. The assembled package measurement and carrier decision matter; the magnet dimensions alone cannot certify transport acceptance.

8. Tax calculation: editable assumptions and a separate cash view

The default example uses a ₹100,000 consignment assessable value, 7.5% BCD, SWS at 10% of BCD and 18% IGST. These are illustrative rates, not a confirmed live tariff assessment. HS 8505.11.90 is a provisional reference for metallic permanent magnets; confirm the correct classification for the actual material and product.

Diagram 8: Landed Duty WaterfallIllustrative rates; broker to verify
100.0%CIF ValueBase CIF+7.5%Basic Duty (BCD)+0.75%SWS (10% BCD)+19.49%(18% on CIF+Duty)IGST (18%)108.25%If full ITC eligibleConditional cost

Illustrative schematic; use the adjacent method, source and limitations. No measured performance or approval is implied.

Reproducible example, INR; assumptions reviewed 2026-10-26
ComponentCalculationDirect importDomestic invoice
BaseEntered assessable / taxable amount₹100,000.00₹100,000.00
BCD7.5% of assessable value₹7,500.00₹0.00
SWS10% of BCD₹750.00₹0.00
GST18% of base + import duties, where applicable₹19,485.00₹18,000.00
Cash requirementBase + BCD + SWS + GST₹127,735.00₹118,000.00
If full GST ITC eligibleCash less GST component₹108,250.00₹100,000.00

Thus 27.735% is the example import-tax arithmetic, not a verified filing rate. For a local stockist purchase, embedded import costs belong in the quoted base; the buyer is not charged customs again. Domestic GST here represents the total entered rate, without deciding CGST / SGST versus IGST.

ICEGATE: Trade Guide on Imports is the verification path. Current automated tariff verification was unavailable at review; recheck origin, effective notifications and exemptions before entering final rates. ITC is conditional, may be delayed and is not guaranteed by registration alone. Assessable value is an input rather than automatically equated to an invoice. Tooling, handling, local freight, finance and additional levies are excluded.

9. Define incoming quality gates before the purchase order

Diagram 7: Tier-1 PPAP Quality GatesIncoming QC at Indian Assembly Plant
G13D CMM ProfileRo, Ri, Wch, TAgree tolerancesArc curvature radiusPerpendicularityPer agreed drawingG2Helmholtz CoilTotal Dipole MomentAgree moment limitsOrientation angleFluxmeter readoutBatch MTR MatchG3Motor thermal testAgreed temperatureAgree loss criterionHcj knee checkAgreed dwell timeInspect damageG4ASTM B117 Spray5% NaCl at 35°CAgree hours / limitsCross-hatch tapeAgree adhesion testBuyer release

Illustrative schematic; use the adjacent method, source and limitations. No measured performance or approval is implied.

Buyer-defined qualification plan; numerical tolerances require agreement
GateEvidence to requestAcceptance / next action
DimensionsDrawing revision, CMM report, coated dimensionsAgree datums, tolerances, sampling and measurement uncertainty
Magnetic propertiesGrade data, lot MTR, calibrated Helmholtz Coil / flux measurement where appropriateDefine the fixture and nominal moment; do not infer grade from one surface-Gauss reading
Thermal durabilityHot curves and motor / coupon protocolAgree temperature, time, opposing field and irreversible-loss threshold
Coating and bondingSalt-fog, adhesion and assembled-part reportsDefine failure criteria and adhesive compatibility
TraceabilityProducing plant, lot labels and change controlHold the lot if drawing, grade or records do not match

These are proposed procurement gates, not a universal IATF or regulatory sampling plan. Agree PPAP level, sample count and release authority with the customer. A failed dimension or uncertain grade should trigger containment, supplier clarification and requalification rather than a lower acceptance threshold.

10. Reproducible worked examples, not customer case studies

The following scenarios are hypothetical. They show calculator inputs and outputs, without claiming tested torque, efficiency, warranty savings or regulatory approval.

2-Wheeler Hub Motor

Inputs: Ø 215 mm, 46 poles, embrace 0.75, 3.5 mm thick, 30 mm long.

Method: concentric sector; 45°C ambient + 95°C assumed magnet rise, then 20°C margin.

Output: chord 11.01 mm; 8.59 g each; N35UH shortlist.

Decision: check packaging clearance and hot curves before requesting production tooling. Fan rating and motor performance remain unassessed.

2W/3W Mid-Drive Arc Envelope

Inputs: Ø 120 mm, 8 poles, embrace 0.72, 4.5 mm thick, 65 mm long.

Method: concentric sector; 45°C ambient + 110°C assumed magnet rise, then 20°C margin.

Output: chord 33.48 mm; 72.12 g each; N35UH shortlist.

Decision: check packaging clearance and hot curves before requesting production tooling. Fan rating and motor performance remain unassessed.

BLDC Ceiling Fan

Inputs: Ø 135 mm, 16 poles, embrace 0.7, 3 mm thick, 18 mm long.

Method: concentric sector; 45°C ambient + 40°C assumed magnet rise, then 20°C margin.

Output: chord 18.5 mm; 7.4 g each; N40H shortlist.

Decision: check packaging clearance and hot curves before requesting production tooling. Fan rating and motor performance remain unassessed.

Arc magnet sizing output: 11.01 mm outer chord, 5.87 degree arc and 8.59 g per segment
Actual software output captured 2026-10-26: magnet envelope Ø215 mm, 46 poles, embrace 0.75, thickness 3.5 mm and axial length 30 mm. Only the result panel is cropped; site chrome is outside the crop. This demonstrates calculation execution, not measured magnet performance or a customer result.

11. RFQ checklist and unresolved engineering risks

Minimum handoff from sizing to a supplier review
RiskMinimum informationMitigation / alternative
Fit mismatchRo, Ri, angle or chord, length, coated tolerances and datumsSend CAD and drawing; do not order from a preset
Magnetic mismatchMaterial data, magnetization vector, polarity and inspection fixtureRadial and parallel magnetization differ; approve a vector drawing
DemagnetizationMagnet temperature and opposing-field envelopeHot-curve review, prototype test or cooling redesign
Corrosion / bonding failureExposure, adhesive, coating and sealing specificationQualify assembled parts; consider encapsulation for immersion
Unbudgeted costExact quantity, tooling, Incoterm, tax and local chargesCompare itemized quotes and maintain a cash buffer
Schedule or plant uncertaintySample milestone, production slot and traceable plantQualify an alternate source; avoid assuming scheme targets equal stock

Return to calculator and export an RFQ ↑

12. Questions grouped by decision

technical

Which diameter should I enter?

Enter twice the magnet outer radius from the arc drawing. Rotor assembly OD includes steel, sleeves or adhesive and is not interchangeable. The model is a concentric arc envelope with one segment per pole.

Can this calculator size an IPM pocket or eccentric magnet?

No. IPM pocket shapes, tapered arcs, skewed slices and multi-piece poles require their actual CAD geometry and electromagnetic analysis. Presets are illustrative arc envelopes, not approved motor designs.

Why add a 20°C temperature margin?

It is an editable-design starting assumption implemented as a fixed screening margin, not a statutory rule. It reserves room above estimated magnet temperature; the required margin still depends on load line, opposing field and supplier data.

Does an SH or UH suffix guarantee motor demagnetization safety?

No. The shortlist uses typical supplier temperature classes. Request temperature-dependent B-H curves and validate peak-current, field-weakening and fault cases. Winding temperature is not necessarily magnet temperature.

Does ASTM B117 certify a magnet for the Indian monsoon?

No. It defines a salt-fog test environment. Exposure hours and acceptance criteria must be agreed for the product, and hours alone do not predict service life. The tool displays proposed RFQ discussion targets, not certified ratings.

Can a coating replace a sealed submersible motor design?

No. Confirm sealing, encapsulation, adhesive compatibility, pressure cycling and corrosion testing on the assembled design. A coating candidate does not qualify immersion service.

Will eccentric arcs reduce cogging by a fixed percentage?

No universal percentage is established here. Compare concentric and tapered designs using the same slot/pole combination, air gap, current, magnet volume and test procedure. Check average torque and manufacturing cost as well as ripple.

Is ferrite an interchangeable replacement for NdFeB?

No. Re-evaluate rotor size, flux, current, torque and efficiency with supplier ferrite data. A lower material price may require a larger motor. This calculator assumes NdFeB density for its mass estimate.

regulatory

Does AIS-156 mandate a particular magnet grade?

The cited Amendment 3 addresses REESS safety provisions. It does not support the previously asserted universal SH/UH mandate or 3% motor back-EMF limit. Agree the applicable vehicle approval and motor validation plan with the test agency.

What does the ₹7,280 crore REPM scheme establish?

The November 2025 approval targets 6,000 MTPA of integrated manufacturing. It does not prove that an individual supplier can ship automotive arc segments today. Verify the operating plant, sample qualification and traceable production lots.

Does this page determine PM E-DRIVE or BIS eligibility?

No. Eligibility depends on the product, scheme version, applicable quality orders and supporting records. Confirm current requirements with the buyer and responsible authority; imported content is not automatically approved or excluded here.

Does a 28 W fan automatically earn a BEE 5-Star label?

No. Rating depends on the applicable sweep category, service value, test conditions and current notification. Magnet selection alone cannot award the label. Check the current BEE schedule and model registration.

procurement

Is 27.735% the guaranteed import tax rate?

No. It is the arithmetic result of the example inputs: 7.5% BCD, 10% SWS on BCD and 18% IGST on value plus those duties. Edit rates after broker confirmation of classification, origin, exemptions and filing date.

Why does local stockist mode show no customs duty?

The scenario starts from a domestic supplier taxable invoice. Import costs, if any, are already embedded in that price. The tool adds only the entered total GST rate; it does not charge the buyer a second import duty.

Can every buyer recover all GST?

No. The after-credit figure is conditional on full eligibility and usable credit. Registration alone does not establish eligibility or recovery timing. Keep the cash requirement and the conditional economic cost separate.

What if I cannot copy the RFQ or do not have a drawing?

Use the visible brief to select text manually or download the TXT file. If dimensions are incomplete, send the application, temperature assumptions and existing rotor drawing for engineering review rather than ordering from a preset.

13. Sources, dates and known evidence gaps

Prepared by EVMotorMagnets as a preliminary engineering and procurement guide. Direct sources support their stated scope. Calculator assumptions, hypothetical examples and unknown supplier performance are identified separately; no professional credential or customer result is implied.

Known gaps: live tariff applicability, product-specific PM E-DRIVE / BIS eligibility, individual plant capacity and actual motor / coating performance need confirmation before purchase. No forecast, sample test or policy target is treated as verified production evidence.

First recorded 2026-10-26 · Reviewed 2026-10-26 · Next review target 2027-01-26. This is an editorial target, not an automated schedule. Recheck time-sensitive rules at transaction time.

Request a drawing and quotation review