Separate stock availability from manufacturing origin
The domestic policy targets future integrated capacity; it does not certify current supplier stock. Request a plant address and batch evidence. PIB: Cabinet approval of sintered REPM scheme
India procurement planner · reviewed 2026-10-26
Compare an Indian stockist with direct air or sea imports. Get a route, an editable tax example and a drawing checklist for your next RFQ.
Run the checker to see a gateway candidate, gross tax example and the evidence still needed to place an order.
For standard example inputs, modeled tax is ₹27,735.00 on ₹100,000. Stock, transit time, scheme relief and grade suitability require confirmation.
Have only a drawing? Start with the RFQ checklist.Use these checks to decide what to buy, what to validate and what remains unknown. The route recommendation is an editorial heuristic; the dated official evidence supports the boundaries below.
The domestic policy targets future integrated capacity; it does not certify current supplier stock. Request a plant address and batch evidence. PIB: Cabinet approval of sintered REPM scheme
Check current tariff notifications and broker-confirmed value. CGST credit has conditions; this calculator makes no automatic deduction. ICEGATE: Trade Guide on Imports; CBIC: CGST Act, section 16
Use magnet temperature and demagnetization curves rather than an India-wide minimum grade. A catalog suffix alone is insufficient. Arnold: NdFeB grade data and temperature limits
Salt-fog practice does not prescribe universal 96-hour or 240-hour pass requirements or service life. ASTM B117-26a: public scope
The cited e-bus PMP lists magnet fitment as a domestic assembly step; it is not a certificate for every motor or vehicle. MHI: PM E-DRIVE e-bus PMP, item 8
| Channel | Useful when | Evidence to request | Cost and fit limits |
|---|---|---|---|
| Indian stockist | A documented catalog arc matches the prototype drawing. | Physical stock, grade certificate, pole map, original plant and batch ID. | Delivery and stock unverified; distributor margin and geometry mismatch may outweigh convenience. |
| Direct factory | You need custom radii, magnetization or repeat batches. | Drawing approval, tooling quote, temperature curves, process and inspection plan. | Tooling, MOQ, qualification and import costs need separate quotes. |
| Indian motor / rotor integrator | Local assembly and testing are needed alongside magnets. | Magnet origin, assembly traceability, adhesive process and acceptance plan. | Local assembly does not prove local sintering or vehicle incentive eligibility. |
| Prospective integrated REPM manufacturer | You are qualifying a future domestic source. | Commissioning status, actual arc capability, audited pilot batch and capacity. | Policy target and nominal tonnage do not demonstrate qualified arc output. |
The 2025-11-26 Cabinet announcement specifies a ₹7,280 crore scheme and 6,000 MTPA target, with a two-year gestation period from award. Current stock and supplier-specific commercial output remain unverified here. PIB: Cabinet approval of sintered REPM scheme
First obtain the eight-digit CTH, origin, relevant notification and INR assessable value from your broker. The tool is a reproducible arithmetic scenario with editable rates; it does not establish the current tariff or final landed purchase cost. ICEGATE: Trade Guide on Imports; CBIC: Customs Act, section 14
| Item | Formula | Example (INR) |
|---|---|---|
| Assessable value V | Broker-confirmed value; ₹100,000 for this example | ₹1,00,000.00 |
| Basic Customs Duty | V × 7.5% | ₹7,500.00 |
| Social Welfare Surcharge | BCD × 10% | ₹750.00 |
| IGST | (V + BCD + SWS) × 18% | ₹19,485.00 |
| Gross modeled tax | BCD + SWS + IGST = 27.735% of V | ₹27,735.00 |
| Value + modeled tax | V + gross tax; before excluded costs | ₹1,27,735.00 |
The model includes only BCD, SWS on BCD and IGST on value plus those two charges. Other duties, cess, safeguards or transaction-specific valuation adjustments can change the base and total. Monetary output rounds to two decimals after calculation; filing systems may round differently. ITC is not deducted. CBIC: CGST Act, section 16

| Procedure | What the checker displays | What must be confirmed |
|---|---|---|
| Standard import | Gross illustrative tax using entered rates. | CTH, origin, date, assessable value, exemptions and any additional levies. |
| Advance Authorisation | Standard-rate comparator. Scheme payable tax and savings not calculated. | Authorisation, covered inputs, input-output norms, notification conditions and export obligation. Generally 18 months or as notified. Government of India: Advance Authorisation |
| MOOWR bonded manufacturing | Standard-rate comparator. No automatic zero or deferred-tax figure. | Licensed premises and procedure, input/capital-goods distinction, current IGST treatment and domestic/export clearance. The linked guidance is from 2023. Bengaluru Customs: MOOWR guidance |
| Indian stockist | Import-tax calculation omitted. | Domestic supplier GST invoice, goods origin, delivered quote and any eligible credit. |
These are planning candidates based on destination geography, not verified service coverage or cheapest routes. Ask your forwarder to compare origin, sailing or flight availability, cargo restrictions, inland delivery and total destination charges.
| Delivery cluster | Sea candidate | Air candidate |
|---|---|---|
| Pune / Chakan | JNPA / Nhava Sheva | Mumbai (BOM) |
| Delhi NCR | Mundra or JNPA + inland depot | Delhi (DEL) |
| Bengaluru / Hosur | Chennai or Kattupalli | Bengaluru (BLR) |
| Chennai | Chennai or Kattupalli | Chennai (MAA) |
| Gujarat | Mundra or Hazira | Ahmedabad (AMD) |
| Coimbatore | Kochi or Thoothukudi | Coimbatore (CJB), subject to service |
Air classification concerns the finished package, not the individual magnet grade. IATA identifies shipper classification responsibility and state/operator variations. Obtain a package assessment from a qualified laboratory or dangerous-goods forwarder. Ask a trained forwarder to apply the current edition and carrier variations; no universal shielding thickness or certificate format is specified here. IATA: dangerous-goods regulations and operator variations
Lead time remains unknown until the supplier confirms tooling, qualification and cargo-ready dates and the forwarder confirms booking, clearance and inland transport. The checker does not invent a production-to-door duration.
Check the magnet operating point, not just local ambient or winding temperature. The tool flags a catalog example boundary; a result below it still needs magnetic-circuit and adhesive validation. These are supplier catalog examples, not national minimum grades. Arnold: NdFeB grade data and temperature limits
| Material family | Example temperature marker | Decision boundary |
|---|---|---|
| Standard N NdFeB | 80°C for common listed grades | Review the exact supplier curve and reverse-field condition. No automatic country-wide rejection. |
| SH NdFeB | 150°C for listed catalog examples | At or beyond this marker, revisit grade or cooling. Below it is not proof of suitability. |
| UH / EH NdFeB | 180°C / 200°C for listed examples | Compare remanence, coercivity, geometry and cost at the actual operating point. |
| Ferrite ceramic | Not inferred from an NdFeB suffix | Obtain ferrite curves including low-temperature behavior; assess a rotor redesign if changing material. |
| Option | Useful questions | Evidence and trade-off |
|---|---|---|
| Ni-Cu-Ni | Will the motor stay dry? How are edges and handling damage controlled? | Confirm coverage, adhesion and corrosion test results on the actual geometry; do not infer monsoon lifetime from plating name. |
| Epoxy or duplex coating | Does the adhesive bond to it? What is the coating allowance on the air gap? | Request cured thickness, edge coverage and sample-bond validation; extra coating can change tolerance and assembly. |
| Sealing / encapsulation | Can water enter along the shaft, cable or housing? | Validate assembly ingress protection and thermal path; coating does not establish motor IP rating. |
ASTM B117 describes the salt-fog practice. Exposure duration, sample preparation and pass criteria must come from the agreed product specification. A salt-fog result is not a direct service-life prediction. Pressure-cooker and HAST tests need separately agreed methods; they are not interchangeable requirements. ASTM B117-26a: public scope
| Evidence | Supported conclusion | Unresolved before ordering |
|---|---|---|
| PIB: Cabinet approval of sintered REPM scheme | The 2025 Cabinet scheme targets integrated sintered REPM manufacture. | Supplier output, grade capability, qualified arc capacity and availability are not established by the announcement. |
| MHI: PM E-DRIVE e-bus PMP, item 8 | The cited e-bus PMP item 8 lists domestic traction motor assembly including magnet fitment. | Current amendments, vehicle category, sourcing/assembly records and test-agency assessment. No blanket imported-magnet subsidy assurance. |
| MoRTH / PIB: AIS-156 battery-safety amendment | The cited MoRTH announcement concerns L-category electric powertrain and battery safety. | Motor-level bond, corrosion, thermal and flux acceptance must be specified separately; do not attribute universal magnet criteria to AIS-156. |
| BIS / motor efficiency approvals | Applicability depends on product, motor type, rated range and current order. | Ask the responsible test agency to identify the applicable standard and QCO. This page does not declare all BLDC/EV/pump motors subject to one IE class. |
Do not convert a policy target into a 100% import-dependence claim or infer a national supply total from an absence of public supplier data. No live domestic production census, bidder list or market-demand decomposition is provided here.
These are worked planning examples, not named customer projects or measured delivery outcomes.
Assume a pilot batch, auto route, SH and ₹100,000 assessable value. Auto suggests air via Mumbai; default modeled tax is ₹27,735. Unknown magnet temperature keeps the grade unqualified.
Next: request curves and thermal duty data, plus a carrier-accepted packed-cargo quote. Change the route if packed weight or urgency favors sea.
Assume series production, explicit air, EH and a 160°C peak. The explicit choice stays air via Chennai; the tool does not silently substitute sea. The catalog screen does not approve the motor.
Next: compare air against a separately quoted sea batch and validate the high-temperature load line and adhesive.
Assume a sample purchase and local stockist route. Import tax and gateway clearance are omitted. Ferrite selection does not inherit NdFeB suffix limits.
Next: obtain the supplier invoice, original batch data and drawing match. If stock does not match, send the drawing for a custom factory quote.
| Risk | Consequence | Mitigation / alternative |
|---|---|---|
| Wrong radius, pole map or magnetization | Fit or torque failure even when the nominal grade matches. | Approve a dimensioned drawing and inspection fixture; qualify a sample rotor before a series order. |
| Unverified tariff or assumed tax relief | Underbudgeted cash, rejected exemption or delayed clearance. | Obtain a broker calculation with dated notifications; retain a gross-tax comparator until eligibility is confirmed. |
| Tooling and freight hidden in piece price | Low advertised price becomes a high delivered cost. | Separate tooling, inspection, shielding, freight, destination fees, credit timing and scrap; compare the same Incoterm. |
| Thermal or corrosion mismatch | Flux loss, swelling, bond damage or rejected assemblies. | Agree actual motor duty, curves, coating/bond compatibility and measurable OEM acceptance criteria. |
| Availability or localization assumed | Production slip or failed compliance assessment. | Audit the factory and assembly process; qualify a second source or a redesigned material option if justified. |
Attach the checker brief if available. If a measurement or tariff is unknown, mark it unknown and request a manual review rather than approving a guessed value.
Ask an Indian stockist for the exact drawing, stock quantity, original manufacturing site and batch certificate. A local invoice does not establish Indian magnet manufacture. Custom radii, pole maps and tolerances may need a factory order; the checker does not query live inventory.
No. The 26 November 2025 PIB announcement gives a ₹7,280 crore outlay and a 6,000 MTPA integrated manufacturing target. It does not establish a particular supplier’s qualified arc output, current stock, delivery date or a zero-domestic-output claim.
The automatic rule suggests air for samples and pilot batches, and sea for series production. It is a planning heuristic. Compare actual packed weight, urgency, shielding, sailing schedule and destination charges; you can override the route.
Start with the 8505.11 metal or 8505.19 other permanent-magnet heading, then ask your broker to confirm the eight-digit CTH and applicable notifications. The default 7.5% BCD, 10% SWS on BCD and 18% IGST are an editable arithmetic example, not verified current rates.
On ₹100 of assessable value, the example gives ₹7.50 BCD, ₹0.75 SWS, and ₹19.485 IGST on ₹108.25. Total modeled tax is ₹27.735, or 27.735% before rounding. Additional charges or duties are outside this model.
Do not assume this. IGST credit is subject to the applicable CGST conditions, documentation and restrictions; a GST registration alone is insufficient. The checker shows gross cash tax and does not deduct an assumed credit or promise a refund.
No. The selector shows a standard-rate comparator and an eligibility-review instruction. Duty relief depends on the authorisation, covered inputs, norms, relevant notifications and export obligations. Obtain written confirmation before budgeting an exemption.
No. Bonded manufacturing can change the timing and treatment of liability. Licensed procedures, the goods involved and export or domestic clearance matter. This tool does not calculate MOOWR payable duty or claim that all IGST is deferred.
Failure depends on magnet temperature, operating point and reverse field, rather than the country alone. Standard catalog N grades often list an 80°C example limit. Obtain temperature-dependent demagnetization curves and validate the actual motor duty cycle before selecting or rejecting a grade.
No. SH and UH catalog examples commonly list 150°C and 180°C, but the suffix is not a motor approval. Geometry, load line, reverse field, supplier data and adhesive limits determine suitability. Missing peak magnet temperature means the grade remains unqualified.
Treat it as a motor redesign. Compare flux, available volume, air gap, current, efficiency and cold-temperature demagnetization behavior. Confirm the ferrite supplier’s own curves; the checker does not transfer NdFeB temperature ratings to ferrite.
No. ASTM B117 defines a salt-fog test practice and does not prescribe product-specific exposure periods or acceptance criteria. Agree coating thickness, substrate, edge coverage, duration and failure criteria with the customer; accelerated exposure is not a direct service-life warranty.
The cited AIS-156 document addresses vehicle electrical safety and rechargeable energy storage safety. It does not establish a universal magnet bond-strength, coating, flux-loss or thermal-shock acceptance specification. Agree motor-level tests separately with the OEM and test agency.
No. The cited e-bus PMP lists domestic traction motor assembly including magnet fitment, but eligibility depends on the applicable vehicle category, document version, processes and test-agency assessment. A raw-magnet purchase alone cannot establish vehicle subsidy eligibility.
No. Classification depends on the finished package field measurement, current dangerous-goods rules and carrier requirements. Agree a package test and shielding plan with the forwarder. The IATA guidance explains classification responsibility and operator variations; it is not a package test or carrier acceptance certificate.
Send the dimensioned arc drawing, material and temperature curves required, magnetization and pole map, quantity, coating and adhesive requirements, destination postcode, requested factory-ready date and Incoterm. Include the checker brief and ask separately for tooling, freight and inspection costs.
By EVMotorMagnets. First recorded · Reviewed . Each link below identifies the document or service behind the relevant claim. Document dates are distinct from the page review date. Live tariff rates, inventory, freight offers, subsidy eligibility and individual factory output are not verified by this page.
EVMotorMagnets publishes this procurement planner and accepts quote requests. The route rules and worked examples are editorial screening aids, not supplier audits or measured motor tests. We review this guide every six months, next due 2027-04-26, and sooner if the cited rules or source documents change. Confirm live tariff and carrier requirements for every shipment.
Live lookup service · reviewed 2026-10-26
Check the eight-digit classification, origin and applicable notifications. This page has no live tariff feed.
Act with amendment history · reviewed 2026-10-26
Assessable value can require adjustments to invoice value; ask the broker to establish the INR base.
Act with amendment history · reviewed 2026-10-26
Input tax credit is conditional. Registration alone does not establish entitlement or immediate recovery.
Scheme summary; recheck at application · reviewed 2026-10-26
Duty relief for qualifying export inputs depends on authorisation, norms and conditions; export obligation is generally 18 months or as notified.
2023 guidance; not a current tax ruling · reviewed 2026-10-26
Bonded manufacturing is a licensed procedure. Confirm current treatment for inputs, capital goods and domestic clearance separately.
2025-11-26 · reviewed 2026-10-26
₹7,280 crore outlay and 6,000 MTPA target. A policy target is not evidence of available arc stock or qualified factory output.
Document hosted July 2025; check amendments · reviewed 2026-10-26
Lists domestic traction motor assembly including magnet fitment for e-buses. Does not certify a particular magnet shipment or every vehicle category.
2022-09-01 announcement; check current amendments · reviewed 2026-10-26
Describes AIS-156 for L-category electric powertrains and battery safety. It does not establish universal magnet coating or bond-strength acceptance.
Manufacturer catalog; not a national standard · reviewed 2026-10-26
Grade-specific properties and temperature examples. Shape, magnetic circuit and operating point affect grade selection.
2026 edition · reviewed 2026-10-26
Defines salt-fog apparatus and practice, not a product-specific exposure duration or acceptance criterion.
Live guidance; use the edition applicable to shipment · reviewed 2026-10-26
Explains shipper classification responsibility, current dangerous-goods regulations and state/operator variations. Obtain a qualified package assessment and carrier acceptance.
Send the arc drawing, quantity and delivery postcode. Include the checker brief and mark any unknown requirements for review.
Request an India sourcing quote