Arc Magnets in India: Sourcing Checker & Import Guide

Compare an Indian stockist with direct air or sea imports. Get a route, an editable tax example and a drawing checklist for your next RFQ.

India sourcing checker

Example defaults: Pune, EV motor, SH grade; peak temperature unknown. Import example: ₹100,000 value, 7.5% BCD, 10% SWS on BCD, 18% IGST. Rates are illustrative, not verified current tariffs.

Adjust material, destination & duty assumptions

Leave blank if unknown. −50 to 300°C; up to 2 decimals. Use magnet temperature, not winding temperature.

₹0.01–₹1 billion; up to 2 decimals. Include broker-confirmed valuation adjustments; CIF is only a starting point.

0–100%; up to 2 decimals. Confirm current rate and notifications.

0–100%; up to 2 decimals. Applied to modeled BCD, not the goods value.

0–100%; up to 2 decimals. Applied to value + modeled BCD + SWS.

All dropdowns have example defaults. Numeric import inputs are ignored for local purchases. No live prices, inventory, sailing schedules or eligibility checks are connected.

Read the calculation method and exclusions
Choose a route and run the checker. Example assumptions are editable below.

Your sourcing plan

  1. 1Choose route
  2. 2Review costs
  3. 3Send RFQ

Run the checker to see a gateway candidate, gross tax example and the evidence still needed to place an order.

For standard example inputs, modeled tax is ₹27,735.00 on ₹100,000. Stock, transit time, scheme relief and grade suitability require confirmation.

Have only a drawing? Start with the RFQ checklist.

Five decisions before ordering arc magnets in India

Use these checks to decide what to buy, what to validate and what remains unknown. The route recommendation is an editorial heuristic; the dated official evidence supports the boundaries below.

Separate stock availability from manufacturing origin

The domestic policy targets future integrated capacity; it does not certify current supplier stock. Request a plant address and batch evidence. PIB: Cabinet approval of sintered REPM scheme

Specify coating acceptance with the customer

Salt-fog practice does not prescribe universal 96-hour or 240-hour pass requirements or service life. ASTM B117-26a: public scope

Confirm the applicable assembly and approval rules

The cited e-bus PMP lists magnet fitment as a domestic assembly step; it is not a certificate for every motor or vehicle. MHI: PM E-DRIVE e-bus PMP, item 8

Indian sourcing channels compared

  1. 1Identify factory
  2. 2Trace batch
  3. 3Qualify sample
Sourcing choices — qualitative planning comparison — scroll horizontally on small screens.
ChannelUseful whenEvidence to requestCost and fit limits
Indian stockistA documented catalog arc matches the prototype drawing.Physical stock, grade certificate, pole map, original plant and batch ID.Delivery and stock unverified; distributor margin and geometry mismatch may outweigh convenience.
Direct factoryYou need custom radii, magnetization or repeat batches.Drawing approval, tooling quote, temperature curves, process and inspection plan.Tooling, MOQ, qualification and import costs need separate quotes.
Indian motor / rotor integratorLocal assembly and testing are needed alongside magnets.Magnet origin, assembly traceability, adhesive process and acceptance plan.Local assembly does not prove local sintering or vehicle incentive eligibility.
Prospective integrated REPM manufacturerYou are qualifying a future domestic source.Commissioning status, actual arc capability, audited pilot batch and capacity.Policy target and nominal tonnage do not demonstrate qualified arc output.

The 2025-11-26 Cabinet announcement specifies a ₹7,280 crore scheme and 6,000 MTPA target, with a two-year gestation period from award. Current stock and supplier-specific commercial output remain unverified here. PIB: Cabinet approval of sintered REPM scheme

Landed cost method, assumptions and exclusions

First obtain the eight-digit CTH, origin, relevant notification and INR assessable value from your broker. The tool is a reproducible arithmetic scenario with editable rates; it does not establish the current tariff or final landed purchase cost. ICEGATE: Trade Guide on Imports; CBIC: Customs Act, section 14

  1. 1Assessable value
  2. 2BCD + SWS
  3. 3IGST on base
Worked example — ₹100,000 value, illustrative rates only — scroll horizontally on small screens.
ItemFormulaExample (INR)
Assessable value VBroker-confirmed value; ₹100,000 for this example₹1,00,000.00
Basic Customs DutyV × 7.5%₹7,500.00
Social Welfare SurchargeBCD × 10%₹750.00
IGST(V + BCD + SWS) × 18%₹19,485.00
Gross modeled taxBCD + SWS + IGST = 27.735% of V₹27,735.00
Value + modeled taxV + gross tax; before excluded costs₹1,27,735.00

The model includes only BCD, SWS on BCD and IGST on value plus those two charges. Other duties, cess, safeguards or transaction-specific valuation adjustments can change the base and total. Monetary output rounds to two decimals after calculation; filing systems may round differently. ITC is not deducted. CBIC: CGST Act, section 16

Arc magnets in India checker showing ₹27,735 illustrative tax on ₹100,000 assessable value
Reproduced software result, captured 2026-10-26: default pilot/air scenario, Pune, ₹100,000 value, 7.5% BCD, 10% SWS on BCD and 18% IGST. Run the checker with these inputs to reproduce ₹27,735 gross modeled tax. This cropped result is software evidence; it does not document actual customs charges, shipment performance or a customer project.
Import procedures — relief is not granted by a selector — scroll horizontally on small screens.
ProcedureWhat the checker displaysWhat must be confirmed
Standard importGross illustrative tax using entered rates.CTH, origin, date, assessable value, exemptions and any additional levies.
Advance AuthorisationStandard-rate comparator. Scheme payable tax and savings not calculated.Authorisation, covered inputs, input-output norms, notification conditions and export obligation. Generally 18 months or as notified. Government of India: Advance Authorisation
MOOWR bonded manufacturingStandard-rate comparator. No automatic zero or deferred-tax figure.Licensed premises and procedure, input/capital-goods distinction, current IGST treatment and domestic/export clearance. The linked guidance is from 2023. Bengaluru Customs: MOOWR guidance
Indian stockistImport-tax calculation omitted.Domestic supplier GST invoice, goods origin, delivered quote and any eligible credit.

Gateway candidates and shipping qualification

These are planning candidates based on destination geography, not verified service coverage or cheapest routes. Ask your forwarder to compare origin, sailing or flight availability, cargo restrictions, inland delivery and total destination charges.

Candidate gateways — no distance or transit guarantee — scroll horizontally on small screens.
Delivery clusterSea candidateAir candidate
Pune / ChakanJNPA / Nhava ShevaMumbai (BOM)
Delhi NCRMundra or JNPA + inland depotDelhi (DEL)
Bengaluru / HosurChennai or KattupalliBengaluru (BLR)
ChennaiChennai or KattupalliChennai (MAA)
GujaratMundra or HaziraAhmedabad (AMD)
CoimbatoreKochi or ThoothukudiCoimbatore (CJB), subject to service
  1. 1Package test
  2. 2Carrier approval
  3. 3Delivery quote

Air classification concerns the finished package, not the individual magnet grade. IATA identifies shipper classification responsibility and state/operator variations. Obtain a package assessment from a qualified laboratory or dangerous-goods forwarder. Ask a trained forwarder to apply the current edition and carrier variations; no universal shielding thickness or certificate format is specified here. IATA: dangerous-goods regulations and operator variations

Lead time remains unknown until the supplier confirms tooling, qualification and cargo-ready dates and the forwarder confirms booking, clearance and inland transport. The checker does not invent a production-to-door duration.

Grade, geometry and monsoon protection

Check the magnet operating point, not just local ambient or winding temperature. The tool flags a catalog example boundary; a result below it still needs magnetic-circuit and adhesive validation. These are supplier catalog examples, not national minimum grades. Arnold: NdFeB grade data and temperature limits

  1. 1Magnet peak °C
  2. 2Curve + load line
  3. 3Rotor validation
Material screening — catalog examples, not approval limits — scroll horizontally on small screens.
Material familyExample temperature markerDecision boundary
Standard N NdFeB80°C for common listed gradesReview the exact supplier curve and reverse-field condition. No automatic country-wide rejection.
SH NdFeB150°C for listed catalog examplesAt or beyond this marker, revisit grade or cooling. Below it is not proof of suitability.
UH / EH NdFeB180°C / 200°C for listed examplesCompare remanence, coercivity, geometry and cost at the actual operating point.
Ferrite ceramicNot inferred from an NdFeB suffixObtain ferrite curves including low-temperature behavior; assess a rotor redesign if changing material.
  1. 1Exposure profile
  2. 2Coating + bond
  3. 3Agree pass criteria
Coating decisions — customer-defined acceptance — scroll horizontally on small screens.
OptionUseful questionsEvidence and trade-off
Ni-Cu-NiWill the motor stay dry? How are edges and handling damage controlled?Confirm coverage, adhesion and corrosion test results on the actual geometry; do not infer monsoon lifetime from plating name.
Epoxy or duplex coatingDoes the adhesive bond to it? What is the coating allowance on the air gap?Request cured thickness, edge coverage and sample-bond validation; extra coating can change tolerance and assembly.
Sealing / encapsulationCan water enter along the shaft, cable or housing?Validate assembly ingress protection and thermal path; coating does not establish motor IP rating.

ASTM B117 describes the salt-fog practice. Exposure duration, sample preparation and pass criteria must come from the agreed product specification. A salt-fog result is not a direct service-life prediction. Pressure-cooker and HAST tests need separately agreed methods; they are not interchangeable requirements. ASTM B117-26a: public scope

Policy and standards: what the evidence establishes

Regulatory scope and evidence limits — reviewed 2026-10-26 — scroll horizontally on small screens.
EvidenceSupported conclusionUnresolved before ordering
PIB: Cabinet approval of sintered REPM schemeThe 2025 Cabinet scheme targets integrated sintered REPM manufacture.Supplier output, grade capability, qualified arc capacity and availability are not established by the announcement.
MHI: PM E-DRIVE e-bus PMP, item 8The cited e-bus PMP item 8 lists domestic traction motor assembly including magnet fitment.Current amendments, vehicle category, sourcing/assembly records and test-agency assessment. No blanket imported-magnet subsidy assurance.
MoRTH / PIB: AIS-156 battery-safety amendmentThe cited MoRTH announcement concerns L-category electric powertrain and battery safety.Motor-level bond, corrosion, thermal and flux acceptance must be specified separately; do not attribute universal magnet criteria to AIS-156.
BIS / motor efficiency approvalsApplicability depends on product, motor type, rated range and current order.Ask the responsible test agency to identify the applicable standard and QCO. This page does not declare all BLDC/EV/pump motors subject to one IE class.

Do not convert a policy target into a 100% import-dependence claim or infer a national supply total from an absence of public supplier data. No live domestic production census, bidder list or market-demand decomposition is provided here.

Three illustrative procurement scenarios

These are worked planning examples, not named customer projects or measured delivery outcomes.

1. Pune pilot with unknown rotor temperature

Assume a pilot batch, auto route, SH and ₹100,000 assessable value. Auto suggests air via Mumbai; default modeled tax is ₹27,735. Unknown magnet temperature keeps the grade unqualified.

Next: request curves and thermal duty data, plus a carrier-accepted packed-cargo quote. Change the route if packed weight or urgency favors sea.

2. Chennai series run with urgent air delivery

Assume series production, explicit air, EH and a 160°C peak. The explicit choice stays air via Chennai; the tool does not silently substitute sea. The catalog screen does not approve the motor.

Next: compare air against a separately quoted sea batch and validate the high-temperature load line and adhesive.

3. NCR prototype bought from a stockist

Assume a sample purchase and local stockist route. Import tax and gateway clearance are omitted. Ferrite selection does not inherit NdFeB suffix limits.

Next: obtain the supplier invoice, original batch data and drawing match. If stock does not match, send the drawing for a custom factory quote.

Procurement risks and practical mitigations

Risk register — actions before release — scroll horizontally on small screens.
RiskConsequenceMitigation / alternative
Wrong radius, pole map or magnetizationFit or torque failure even when the nominal grade matches.Approve a dimensioned drawing and inspection fixture; qualify a sample rotor before a series order.
Unverified tariff or assumed tax reliefUnderbudgeted cash, rejected exemption or delayed clearance.Obtain a broker calculation with dated notifications; retain a gross-tax comparator until eligibility is confirmed.
Tooling and freight hidden in piece priceLow advertised price becomes a high delivered cost.Separate tooling, inspection, shielding, freight, destination fees, credit timing and scrap; compare the same Incoterm.
Thermal or corrosion mismatchFlux loss, swelling, bond damage or rejected assemblies.Agree actual motor duty, curves, coating/bond compatibility and measurable OEM acceptance criteria.
Availability or localization assumedProduction slip or failed compliance assessment.Audit the factory and assembly process; qualify a second source or a redesigned material option if justified.

RFQ minimum specification template for India

  1. 1Drawing + poles
  2. 2Batch evidence
  3. 3Delivered quote
  • Dimensioned arc drawing: inner and outer radius, arc angle, axial length, tolerances, edge treatment and coating allowance.
  • Material and magnetic target: exact supplier grade, magnetization direction, pole map, minimum flux and test fixture.
  • Duty profile: magnet peak temperature, duration, reverse field, cooling and adhesive temperature limit; request relevant demagnetization curves.
  • Environmental acceptance: coating system, thickness, adhesive compatibility, agreed corrosion / bond / thermal test and pass criteria.
  • Commercial scope: sample and series quantities, tooling ownership and cost, batch traceability, inspection report and factory-ready date.
  • India delivery: consignee and postcode, Incoterm, origin, packed weight, air-package classification if relevant, customs broker and procedure.

Attach the checker brief if available. If a measurement or tariff is unknown, mark it unknown and request a manual review rather than approving a guessed value.

Arc magnets in India: technical & commercial FAQ

Sourcing

Can I buy arc magnets locally in India?

Ask an Indian stockist for the exact drawing, stock quantity, original manufacturing site and batch certificate. A local invoice does not establish Indian magnet manufacture. Custom radii, pole maps and tolerances may need a factory order; the checker does not query live inventory.

Does the domestic REPM scheme prove that custom arcs are available?

No. The 26 November 2025 PIB announcement gives a ₹7,280 crore outlay and a 6,000 MTPA integrated manufacturing target. It does not establish a particular supplier’s qualified arc output, current stock, delivery date or a zero-domestic-output claim.

Should a pilot batch travel by air or sea?

The automatic rule suggests air for samples and pilot batches, and sea for series production. It is a planning heuristic. Compare actual packed weight, urgency, shielding, sailing schedule and destination charges; you can override the route.

Customs

What is the exact HS code and import duty for permanent arc magnets entering India?

Start with the 8505.11 metal or 8505.19 other permanent-magnet heading, then ask your broker to confirm the eight-digit CTH and applicable notifications. The default 7.5% BCD, 10% SWS on BCD and 18% IGST are an editable arithmetic example, not verified current rates.

How is the example tax percentage calculated?

On ₹100 of assessable value, the example gives ₹7.50 BCD, ₹0.75 SWS, and ₹19.485 IGST on ₹108.25. Total modeled tax is ₹27.735, or 27.735% before rounding. Additional charges or duties are outside this model.

Can Indian manufacturers reclaim all import tax?

Do not assume this. IGST credit is subject to the applicable CGST conditions, documentation and restrictions; a GST registration alone is insufficient. The checker shows gross cash tax and does not deduct an assumed credit or promise a refund.

Does selecting Advance Authorisation make the result duty-free?

No. The selector shows a standard-rate comparator and an eligibility-review instruction. Duty relief depends on the authorisation, covered inputs, norms, relevant notifications and export obligations. Obtain written confirmation before budgeting an exemption.

Is MOOWR a permanent zero-tax route?

No. Bonded manufacturing can change the timing and treatment of liability. Licensed procedures, the goods involved and export or domestic clearance matter. This tool does not calculate MOOWR payable duty or claim that all IGST is deferred.

Engineering

Why do standard N35 or N45 magnets fail in Indian EV motors?

Failure depends on magnet temperature, operating point and reverse field, rather than the country alone. Standard catalog N grades often list an 80°C example limit. Obtain temperature-dependent demagnetization curves and validate the actual motor duty cycle before selecting or rejecting a grade.

Is SH or UH always the correct grade?

No. SH and UH catalog examples commonly list 150°C and 180°C, but the suffix is not a motor approval. Geometry, load line, reverse field, supplier data and adhesive limits determine suitability. Missing peak magnet temperature means the grade remains unqualified.

Can ferrite replace NdFeB without changing the rotor?

Treat it as a motor redesign. Compare flux, available volume, air gap, current, efficiency and cold-temperature demagnetization behavior. Confirm the ferrite supplier’s own curves; the checker does not transfer NdFeB temperature ratings to ferrite.

Does ASTM B117 prescribe a mandatory coating lifetime?

No. ASTM B117 defines a salt-fog test practice and does not prescribe product-specific exposure periods or acceptance criteria. Agree coating thickness, substrate, edge coverage, duration and failure criteria with the customer; accelerated exposure is not a direct service-life warranty.

Compliance

Does AIS-156 set magnet bond strength or thermal-shock acceptance?

The cited AIS-156 document addresses vehicle electrical safety and rechargeable energy storage safety. It does not establish a universal magnet bond-strength, coating, flux-loss or thermal-shock acceptance specification. Agree motor-level tests separately with the OEM and test agency.

Are imported arcs automatically PM E-DRIVE compliant?

No. The cited e-bus PMP lists domestic traction motor assembly including magnet fitment, but eligibility depends on the applicable vehicle category, document version, processes and test-agency assessment. A raw-magnet purchase alone cannot establish vehicle subsidy eligibility.

Logistics and RFQ

Do all magnet shipments require the same air packaging?

No. Classification depends on the finished package field measurement, current dangerous-goods rules and carrier requirements. Agree a package test and shielding plan with the forwarder. The IATA guidance explains classification responsibility and operator variations; it is not a package test or carrier acceptance certificate.

What should I send with an India RFQ?

Send the dimensioned arc drawing, material and temperature curves required, magnetization and pole map, quantity, coating and adhesive requirements, destination postcode, requested factory-ready date and Incoterm. Include the checker brief and ask separately for tooling, freight and inspection costs.

Sources, review date and evidence limits

By EVMotorMagnets. First recorded · Reviewed . Each link below identifies the document or service behind the relevant claim. Document dates are distinct from the page review date. Live tariff rates, inventory, freight offers, subsidy eligibility and individual factory output are not verified by this page.

EVMotorMagnets publishes this procurement planner and accepts quote requests. The route rules and worked examples are editorial screening aids, not supplier audits or measured motor tests. We review this guide every six months, next due 2027-04-26, and sooner if the cited rules or source documents change. Confirm live tariff and carrier requirements for every shipment.

Ready to review your India drawing?

Send the arc drawing, quantity and delivery postcode. Include the checker brief and mark any unknown requirements for review.

Request an India sourcing quote